Zehnder AA 300 Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Antennes de télévision Zehnder AA 300. Zehnder AA 300 Operating instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 52
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Status: 09.10
Operating InstructionsOperating
Instructions
P
lease keep next to the MVHR unit!
P
lease
keep
next
to
the
MVHR unit!
Mechanical Ventilation Heat Recovery Unit
novus (F) 300novus (F) 300
Device version:
Paul Wärmerückgewinnung GmbH
August-Horch-Straße 7
08141 Reinsdorf
Tel.: +49(0)375 - 303505 - 0
Fax: +49(0)375 - 303505 - 55
Germany
LEFT
RIGHT
Mounting position HORIZONTAL
Components
suitable for
Passive
House
Dr. Wolfgang Feist
Vue de la page 0
1 2 3 4 5 6 ... 51 52

Résumé du contenu

Page 1 - Instructions

Status: 09.10Operating InstructionsOperatingInstructionsPlease keep next to the MVHR unit!PleasekeepnexttotheMVHR unit!Mechanical Ventilation Heat Rec

Page 2

8 2.2.1.2 Description of the Control Functions with the LED Control Panel 2.2.1.2.1 Setup of the Operating Mode The keys , , permit to set up t

Page 3

92.2.1.2.6 Configuration Mode Upper Temperature Threshold of Bypass After the pressing of the key combination and for at least 3 sec, the LED’s

Page 4

10 2.2.2 TFT Touchpanel Figure 4: TFT Touchpanel with stainless steel frame The 3.5 inch TFT display of the Touchpanel comprises 320x240 pixels an

Page 5 - 1 Introduction

112.2.2.1 Description of the Operating Functions with the TFT Touchpanel 2.2.2.1.1 Description of the Operating Functions of the Main Menu Figur

Page 6 - 1.3 Safety

12 Boost ventilation: The boost ventilation mode activates an automatic timing program, in which the fan speed 3 is activated for a duration which

Page 7 - 2.1 Brief Description

13time: day, month, year, hours, minutes), individual values, which are to be adjusted, can be reached and modified using +/-. Modified data is

Page 8 - 2.2 Available Control Units

14 Operating Hours Here, the total operating hours of the ventilation device and the fan operating hours (e.g. the hours, during which the fans were

Page 9

15 Figure 8: Menu structure of settings Submenu Key lock The operation of the TFT Touchpanel can be locked with the help of a preset password menu.

Page 10

16 Choose language Menu is currently not available. Ground pipe diverter A motor-controlled flap which is temperature-controlled closes an optional

Page 11

17By selecting a group of days (e.g. Monday-Friday), the modified data is assigned to each day of the group. The settings for the group "Monday-

Page 13

18 Filters The filter run-time can be set here. An internal timer daily resets the remaining run-time of the filters by one day. After a filter chan

Page 14

19 Figure 11: Filter change 4. Pull the filters C out of the filter slide-in compartments by means of the filter strap E. Figure 12: Filter stra

Page 15

20 2.3.2 What to Do in the Event of a Failure? Please contact the installer immediately in the event of a failure. Make a note of the error display

Page 16

213 Notes for the Installer This section describes how to install and commission novus. 3.1 Principal Configuration of the System Figure 14: Syste

Page 17

22 • Two filter cover caps F • Tightly closing motor bypass flap G • Bypass flap covering H • Highly efficient reverse flow channel heat exchanger

Page 18

233.4 Installation of the novus 3.4.1 Transportation and Unpacking Be careful when transporting and unpacking the novus. The package has to be

Page 19

24 • Mount the delivered mounting sheet with the lugs, which point upwards, horizontally to the wall with regard to the minimum distances of the ty

Page 20 - 2.3 Maintenance by the User

25 Figure 19: Detail of sectional drawing B-B Figure 20: Detail of sectional drawing C-C •

Page 21

26 3.5.3 Connection of the Air Ducts Observe the following points when mounting the air ducts: Figure 22: Tag of the connection of the ai

Page 22 - 2.4 Proper Disposal

27 Figure 23: Condensate connection for vertical wall mounting (Example: RIGHT version ) Figure 24: Condensate connection for horizontal wall mou

Page 24

28 Figure 25: Electrical Connections Analogue and digital input and output signals of sensors (e.g. room air quality sensors) or actuators (e.g. i

Page 25 - IEC power connector

29 Figure 27: Control unit with stainless steel frame; in-wall base plate with control unit adapter; control unit engaged in the

Page 26

30 By means of pressing the buttons + or - , the set value of the system-related air volume flow is adjusted in percent according to Chart 1. If

Page 27

31 Figure 28: Menu structure of setup submenu Sensor type The sensor type of the operating mode automatic sensor can be determined in this menu. R

Page 28

32 Bypass A motor temperature-controlling bypass flap has the air flow flow through or past the heat exchanger. The extract air temperature threshold

Page 29 - 3.5.5 Electrical Connections

33In the event that the threshold value falls below any of the frost protection thresholds, the fans will be deactivated, the bypass flap will be clo

Page 30

34 3. Push both snap locks B in order to release the front plate. Figure 30: Pressing of the snap locks 4. Remove the front plate by approxima

Page 31 - 3.6.1 Operational Readiness

35 Figure 32: Foam covering D with strap C 6. Pull the heat exchanger out of the foam covering by means of the strap. 7. Clean the heat exchange

Page 32 - 3.7.1 Setup Submenu

36 3.10 Visualisation of Errors with the TFT Touchpanel A plain text visualisation of errors is only possible with the TFT Touchpanel. 3.10.1 Senso

Page 33

37• Communication error Response: Supply air fan and extract air fan are deactivated. The bypass is closed. Requirement for reset: After turning the

Page 34

2 3.5 Mounting of the novus ... 23 3.5.1

Page 35 - 3.8.2 Cleaning of the Fans

Appendix 1: Circuit Diagram of the novus

Page 36

X1F1 315mAF2 5A230 VAC, 5 A(geschaltet)4xPE230 VAC, 5 A0..10V oder4..20mA0..10V oder4..20mADI: max. 24 VDChigh >3,5V, low <1V0..10V oder4..20mAb

Page 37

X1 voltage supply 1 PE PE through terminal all 4 PE ducts are contacted among each other, VDE compliant 2 PE PE 3 PE PE 4 PE PE 5 L

Page 38 - 3.10.5 Communication Error

012345678912X11234X2X9X8S1S2X7X3X4X5X61231245678910111213 141516 171819version LEFT version RIGHTS2-1 OFF S2-1 ONIntake air T1 (green) T3 (red)Supply

Page 39 - As of August 25th 2010

X1 fan 1 (LEFT: supply air, RIGHT: extract air) X2 fan 2 (LEFT: extract air, RIGHT: supply air) 1 48P + 48 VDC 1 48P + 48 VDC 2 GND re

Page 40

X1F1 315mAF2 5A230 VAC, 5 A(connected)4xPE230 VAC, 5 A0..10V or4..20mA0..10V or4..20mADI: max. 24 VDChigh >3,5V, low <1V0..10V or4..20mAIntermit

Page 41

Date: 02.09.10 Subject to change in the interest of technical progress. Technical Data Mechanical Ventilation Heat Recovery Unit novus (F) 300 © Pau

Page 42

© Paul Wärmerückgewinnung GmbH • August-Horch-Straße 7 • 08141 Reinsdorf • Germany Tel: +49(0)375-303505-0 • Fax: +49(0)375-303505-55 • E-Mail: info

Page 43

Date: 18.03.10 Subject to change in the interest of technical progress. Checklist A Maintenance by customer © Paul Wärmerückgewinnung GmbH • August-

Page 44

Date: 18.03.10 Subject to change in the interest of technical progress. Checklist B Maintenance by skilled personnel © Paul Wärmerückgewinnung GmbH

Page 45 - Hand-over point

30 Preamble Thank you for deciding on the heat recovery unit novus 300. The heat recovery unit novus 300 has been built according to the current sta

Page 46 - Technical Data

Date: 18.03.2010 Subject to change in the interest of technical progress. Air Flow Report Operating condition, functional check1), instruction

Page 47

Date: 18.03.10 Subject to change in the interest of technical progress. Commissioning and handover certificate Completeness and performance verificat

Page 48 - Maintenance by customer

EC Declaration of Conformity Paul Wärmerückgewinnung GmbH August-Horch-Straße 7 08141 Reinsdorf Germany phone: +49(0)375 - 303505 - 0 fax: +49(0)3

Page 49 - Checklist B

4 1.2 Warranty and Liability 1.2.1 General Information Our “general terms and conditions“ apply for the novus in the currently valid version. The wa

Page 50 - Air Flow Report

5• In order to guarantee that the device will be regularly controlled, it is recommended to conclude a maintenance contract. Your supplier can give

Page 51 - Commissioning and handover

6 2.1.4 Fans The novus includes two maintenance-free 230 VAC radial fans with the integrated power supply unit and electronic commutation. The volume

Page 52 - EC Declaration of Conformity

72.2.1.1 Display of the Operation and Failure Conditions Figure 3: LED-display of the LED control panel Display Function / Meaning L1 ... L7 la

Commentaires sur ces manuels

Pas de commentaire